Location: To be supplied following sign up
Time: 9.00am – 3.00pm
Google ICS
Entrepreneurial Discovery Workshops 2024
Shaping Murrindindi’s Future workshop to identify and develop the focal points of the Regional Context Analysis. Buxton is identified as a prime location (Melbourne University) for pumped hydro power due to its favourable geographical features, including hills, valleys, and proximity to the Goulburn River. The proposition is to leverage existing hydro power stations and explore opportunities in waste-to-energy conversion (circular economy model) to stimulate economic growth and job creation in the region, fostering a strong circular economy.